Fashola Lauds 6,619 Megawatts Power Generation Capacity, Vows to Tackle Distribution Issues

The Minister of Power, Works and Housing, Babatunde Fashola who spoke at the Guardian Business Summit in Lagos last week, has lauded the rise in the electricity generation capacity to 6,619 megawatts noting that the next step for his administration is to tackle the distribution problems, Daily Trust reports.

He said the total hydropower capacity available with the rains from Jebba, Kainji and Shiroro hydro power plants as at September 4, 2017 was about 1,000mw. “So it is the gas thermal plants, arising from peace efforts and pipeline repairs that made up the difference that made the total available power of 6,619mw that was produced,” he noted.

Fashola who cited the announcement on the growth of the Gross Domestic Product (GDP) by the National Bureau of Statistics (NBS) that marked the exit of Nigeria from recession said electricity production as well as financial services and construction also grew strongly.

“Other sectors did very well in the second quarter 2017 include electricity and gas and financial institutions, with electricity and gas growing by 35.5 per cent,” he said. He also added; “Therefore, beyond rhetoric, our next step is to solve the distribution problem. This involves the sustained implementation of the Power Sector Recovery Programme (PSRP).”

Source: EnergyMix

(Visited 144 times, 1 visits today)

Top
Powered by Nextier